Projects

Our work,
on site.

Featured Project / 01

Double-Storey Concrete
Frame Structure

Western Cape · Building Construction
In progress
Wide view of the concrete column and beam frame with brick infill and slab formwork
Where it stands: frame up, brickwork rising, slab formwork in place

Scope of work

A reinforced concrete frame with brick infill walls and a suspended first-floor slab, delivered by our own site team.

  • 01Setting out, levels and excavation
  • 02Foundation reinforcement and concrete
  • 03Columns, beams and slab formwork with full propping
  • 04Pumped concrete pour of the first-floor slab
  • 05Brick infill walls between the frame
  • 06Safe working at height with harnesses and edge protection
Build Sequence

How the structure came together

From the first level reading to the slab pour, these photos follow the build stage by stage.

Site team setting out foundation levels with a dumpy level and staff beside trench reinforcement
Stage 01 · Groundworks

Setting out and levels

Levels are taken with a dumpy level and staff so the foundations and reinforcement go in true to the drawings.

Slab formwork supported by adjustable steel props and timber beams over brick infill walls
Stage 02 · Formwork

Formwork and propping

Adjustable steel props and timber beams carry the slab and beam shutters, braced and levelled before any concrete is placed.

Concrete pump boom placing concrete onto the first-floor slab and beam formwork
Stage 03 · Concrete

Slab concrete pour

A concrete pump places the first-floor slab and beams in one continuous pour for a sound, monolithic structure.

Worker in full-body harness on the slab edge with edge protection in place
Stage 04 · Safety

Working at height

Every worker on the slab wears a full-body harness, with edge protection around the perimeter throughout.

Have a project in mind already?

Tell us what you’re building and we’ll price it properly.